Client References

10 November 2010

DCD-Dorbyl Marine

Att: Conrad Caldwell,
A performance evaluation was conducted on the 7th November 2010 during the Saipem FDS Project

View entire faxed letter here

28 October 2010

Lighting Structures - MP Coetzee

To whom it may concern,

It is with great honor that we the underwritten endorse this letter to staff the quality of work
delivered by Sidwell Maqala.

View entire faxed letter here

25 September 2010

Taggart - JHDA

Hi All,
Just a word of appreciation to all who participated in a professional manner to execute the trestle T15 replacement and the Portal Frame & Head Chute installation during the resent shutdown at UMK. The work was executed on time in a safe and professional manner and well within the client’s time frame.

The following parties participated.

1. Taggart - JHDA
2. Coaltoll
3. Rigging Ropes
4. Sarens
5. Excell E&I
6. Electron
7. Goodyear

Regards
Wend Ewest

5 July 2010

Sasol - Hennie Meyer

To: The Managing Director: Sarens SA (Pty) Ltd
Service Provider Safety Compliance Assessment Outcome:

Thank you for participating in the Service Provider Safety Compliance Assessment Outcome, which was conducted on 05 November 2009 at Secunda.

In line with your risk profile based on your approved scope of work within Sasol, your company has been ranked as a T3 service provider.

View entire faxed letter here

5 July 2010

Viaduct Erection Team - George Swanepoel

We at the Viaduct Erection Team, did 22 successful Girder relocations, with the helping hand from Sarens SA. Each lift was done using a dual lift configuration and with an average weight of between 130 tons and 180 tons.
Sarens SA provides their clients with a reliable and very dedicated team, to ensure that all lifts are done with precision and with optimum safety as a basis.
Their commitment to safety is of a very high standard, with no deviation reported whilst lifting.
We recommend to use Sarens SA for all your lifting requirements.

As they say: NOTHING TOO HIGH, NOTHING TOO HEAVY for Sarens SA.

George Swanepoel
Viaduct Erection Team

28 May 2010

Exxaro - Dries van Zyl

To: Mr Abrie Burger
From: Dries van Zyl
Exxaro Grootegeluk Mine
Ellisras

"I would like to congratulate you for an excellent group of people that are always willing to help"

View entire faxed letter here

Utilities Growth - Salie Dreyer

Hi Ardele

Being involved in many projects and lately constructing the OCGT plant at Sasol Secunda, which since have moved into the phase two of the project. This phase of the project will change/complete the CCGT and two HRSG’s (heat recovery steam generators) are being constructed to the existing plant. It was during the ‘heavy lift’ operations that I met up with your team of enthusiastic and dedicated team. From fist arriving on site followed by the crane assembly, pre rigging set up, rigging and moving out was outstanding.

The task was executed successful and very professional by your leadership and team.

Thanking you.
Salie Dreyer
Operations Specialist/commissioning mngr
Utilities Growth

Sarens News

Orapa - Botswana
Sarens South Africa was requested by a leading diamond mining company in Botswana to relocate one of their Komatsu shovels over a distance of 35km. Sarens used 18 axle lines SPMTs of 3.6m wide to move the weight of 550t. Sarens South Africa was able to save the client 2 months in production by utilising this transport solution.The move itself including travel, loading and offloading was executed within 9 days. This successful move has resulted in talks for additional work and it is one of the first major initiatives in Botswana for Sarens.

New standard in super heavy lifting : SGC 120!
The Sarens Group of Wolvertem, Belgium is pleased and proud to introduce the SGC 120 Crane, which will be available in early 2011. This innovative and versatile Heavy Lift Crane System is the product of the combined engineering efforts of Sarens and its newest group member, Rigging International of Alameda, California.

ESTA Awards 2010 SPMT Job of the Year entry by Sarens nv
On the 22nd of April the ESTA Awards 2010 were revealed in Munich. (View Certificate) Sarens nv won the award for the load out of an oil rig in Stord, Norway. Total weight: over 15 000t which equals 83 empty 747 jumbo jets. The module (90m x 90 m) had to be moved diagonally, after wards another 90 degrees turn on the spot, and is positioned with an accuracy of 2 mm with regard to the other modules. Equipment used: 534 axle lines SPMT, 22 Power Packs (> 8 000 HP)

Platinum Potential Under Scrutiny
As part of its growth strategy into the mining sector, crane hire company Sarens SA is keeping a watchful eye on the platinum market, believing that the commodities revival will also see growth for the company going forward. The mining sector currently contributes a small portion to Sarens SAs business, however, as new life is breathed into projects deferred as a result of the economic slowdown, project construction will see the light of day in the near future, Sarens SA technical & projects director, Lance Strachan, tells Nelendhre Moodley.